Pre-Qualification Engineering & Detail Design for Major Modifications Serang "AS" Platform Facilities.

Indonesia Company, Unocal (2012) Pre-Qualification Engineering & Detail Design for Major Modifications Serang "AS" Platform Facilities.

Full text not available from this repository.
Official URL: http://elib.unikom.ac.id/gdl.php?mod=browse&op=rea...

Abstract

Administrative and financial requirements (Bank reference,audited financial for 1998,current basic document).Technical Requirements (Proposed typical organization chart for a project and list of project completed, Sampling of engineering deliverable, project control progress procedures, QA/QC procedure.

Item Type: Article
Subjects: Collections > Koleksi Perpustakaan Di Indonesia > Perpustakaan Di Indonesia > JKPKELNUSA > Terbitan Internal > Data2 - Dokumentasi > PT. Elnusa Rekabina
Divisions: Universitas Komputer Indonesia > Perpustakaan UNIKOM
Depositing User: Admin Repository
Date Deposited: 16 Nov 2016 07:36
Last Modified: 16 Nov 2016 07:36
URI: http://repository.unikom.ac.id/id/eprint/1597

Actions (login required)

View Item View Item